Coordination and Support for Biogas Systems

biog

Location:  SAN QUIRICO (PARMA)
Economic value of project: € 4.7M
Scope of work: EPCM contract

Year: 2009-2010

Between 2009 and 2010, Sadam Engineering performed coordination and support activities for the implementation of a biogas system in the manufacturing area of the ERIDANIA SADAM S.p.A. plant in San Quirico, Municipality of Trecasali (Pr).

The project consisted of the construction of a new biogas system with a total power of 999 KW/h, made up of a primary and secondary digester, which were isolated and thermo-regulated. This configuration ensures that the system operates in a stable and secure manner. SENG coordinated the development of the system, from the authorisation phase through the final testing phase.