Electrical Panels and Software for Biogas System

biog2

Location: ITALY
Economic value of project: € 1.5M
Scope of work: Software engineering, hardware provisioning and installation

Year: 2012

In 2012, Sadam Engineering worked with Sebigas to install 18 biogas production systems in Italy. As part of this project, SENG provided the electrical panels to power and control the process area for all of the systems, and were responsible for the complete engineering and testing.   

In addition, Sadam Engineering developed the control software for the management system through PLC and HMI, for both touch panel and PC. For each system, SENG monitored the systems’ production launch.

DOWNLOAD

PHOTO
PHOTO

GOOGLE MAP: HERE