Coordination and Support for Photovoltaic Systems

vol2

Location:  SAN QUIRICO (PARMA)
Economic value of project: € 13M
Scope of work: EPCM contract

Year: 2010

In 2010, at ERIDANIA SADAM S.p.A.’s San Quirico manufacturing facility, Sadam Engineering provided coordination and support activities for the realisation of a new photovoltaic system to be installed on the ground, with a total power of 4,491.96 KWp.

The system was connected to the electricity user distribution network at medium voltage by the local distribution company. The system’s tracking information, with regards to the intended use of the installation site according to IEC 0-2 regulations, can be ascribed to the IND-CB group. The choice of the photovoltaic modules was made according to two criteria:

  • provide maximum conversion efficiency, given the limited surface area appropriate and utilisable for the system
  • combine both economics and reliability, also in terms of performance stability over the system’s operating life, estimated at more than 25 years.