de1

Location: JESI
Economic value of project: € 25M
Scope of work: EPCM contract

Year: 2006

In 2006, Sadam Engineering was responsible for planning, installing, commissioning and management of a molasses desugaring system at the sugar production facility in Jesi.  

System details:

  • processing capacity of 300 t/d of molasses
  • more than 80% of crystallisable sugar recovered
  • use of ARI (Amalgamated Research Inc.) separation technology
  • production of betaine syrup at 60% DS of 25-28 t/d through a double loop configuration
  • 2,500 sq. m in area, excluding the storage tanks
  • 3 chromatography separation columns, 6 m in diameter and 15 m high
  • evaporation battery with multiplied effect with 8 falling film evaporators

 